Login Register Home Chinese
Achivement Detail
UndergroundRailwayCivilAirDefenseProjectProtectionAirtightPartitionDevice

0

Registration number:G20250725

Industry:

Subject classification:

Key words: civil defense equipment Underground space military industry equipment

Green classification:

Publisher:管理人员

Release time:2025-08-09 08:58:56.0

  • Essential information
Name of achievement: UndergroundRailwayCivilAirDefenseProjectProtectionAirtightPartitionDevice
Result registration number: G20250725 Subject classification:
Green classification: Item keywords: civil defense equipment  Underground space   military industry equipment    
Recommenders:

Tongji University

The stage of achievement:
Mode of cooperation: Outcome Information:
Countries/regions: China Intellectual property rights:
Introduction: Click to view
The subway protection and sealing partition device relates to the protective isolation technology of underground engineering, especially suitable for large-scale rail transit in underground and emergency situations for the protection and isolation of rail transit passages. The product consists of an upper sliding plate part, a lower sliding plate part, a door leaf part, a door frame part, a hinge part, a locking part, etc., without the need for a dedicated hidden space, saving construction investment and reducing subway costs. The device uses semi-axle hinges and jacks, making the opening and closing of the door leaf flexible and light, with a quick opening and closing speed, meeting the requirements for rapid transition between emergency and normal states. It employs a manual structure composed of worm gear transmission mechanism, screw nut transmission mechanism, and high pair rotating mechanism, which can simultaneously control the movement of the upper sliding plate mechanism, lower sliding plate mechanism, and locking mechanism, allowing the protective partition device to be closed, sealed, or opened at the fastest speed. In emergency situations, this patent's upper and The lower sealing plate and the upper plug board fix and seal the cables inside the channel without damaging them. Once the emergency state is lifted, the entire subway can be put into use immediately.
Name: Gender:
Date of birth: Position:
Nationality: Address:
Mobile: Email:

All comments(0)

Position:1/0 First Previous Next Last Jump to
Similar results
Matching needs

No record

Relevant experts