Login Register Home Chinese
Achivement Detail
3DTOSTunnelDynamicThree-DimensionalMonitoringSystem

0

Registration number:G20250743

Industry:

Subject classification:

Key words: intelligent prediction and early warning Tunnel excavation monitoring

Green classification:

Publisher:管理人员

Release time:2025-08-09 08:59:20.0

  • Essential information
Name of achievement: 3DTOSTunnelDynamicThree-DimensionalMonitoringSystem
Result registration number: G20250743 Subject classification:
Green classification: Item keywords: intelligent prediction and early warning  Tunnel excavation monitoring      
Recommenders:

Tongji University

The stage of achievement:
Mode of cooperation: Outcome Information:
Countries/regions: China Intellectual property rights:
Introduction: Click to view
With the increasing development of national transportation construction, more and more highways are being built in mountainous areas. The excavation of dangerous roads is a common issue encountered in the construction of highways in mountainous regions. Real-time monitoring is of great significance for ensuring the safe construction of tunnels. This system can manage massive amounts of on-site monitoring data by building databases, enabling convenient, fast, and intuitive graphical cross-section interactive queries (including both three-dimensional interactive queries and two-dimensional graphic cross-section modes). The program can intelligently predict and warn based on the monitoring data, and express the safety level of dangerous road construction with a brand new three-dimensional visual effect, providing full-process three-dimensional dynamic monitoring for the safe construction of dangerous roads.
Name: Gender:
Date of birth: Position:
Nationality: Address:
Mobile: Email:

All comments(0)

Position:1/0 First Previous Next Last Jump to
Similar results
Matching needs

No record

Relevant experts